Skip to content
TSTBOUWUW BOUWPARTNER
Renovated gable end with new render and a restored chimney

Projects by TST-Bouw in Apeldoorn and beyond

A cross-section of our work: facades, extensions and finishing. Including the stages that later become invisible, because that is where the craft sits.

Facades and exterior

Renovated side elevation with fresh white render, a large sliding door and dark roof edge

Side elevation re-rendered

The full side elevation given new external render, with new frames and a sliding door to the garden. The roof edge and fascia were taken in at the same time.

Renovated off-white gable end with new gutter, roof edge and restored chimney

Gable end and chimney restored

Gable end re-rendered and painted, roof edge and gutter replaced, and the chimney repointed. The window opening received a new stone sill.

Painted front elevation of a house with a pergola in front and a mobile scaffold tower during exterior painting

Front elevation painted around the pergola

Exterior painting to the full front elevation, frames, front door and roof edge included. The existing pergola and planting stayed put, so the work moved along the facade in stages from a mobile tower.

Gable end with white insulation boards being fitted for external wall insulation, scaffold tower in front

External wall insulation going on

Insulation boards bonded and fixed to the existing brickwork of the gable end. The reinforcement layer and render followed. The house came out warmer and the facade came out new.

Extensions and structure

Red brick house extension during the structural phase, with open window and door apertures

Brick extension going up

New rear extension in brickwork matched to the existing facade. The openings for frames and garden doors are ready and the reinforcement for the top edge is still standing proud.

Extension in grey building blocks with new white window frames and garden doors installed

Extension wind and watertight

The shell of an extension with new frames, opening lights and garden doors fitted. From this point the opening through to the existing house could be made.

Interiors and finishing

Renovated living room with smoothly plastered walls, new garden doors and a bare screed floor

Living room skimmed flat

Walls and ceiling skimmed smooth and new garden doors fitted. The screed is down, the frames are painted, and the room is ready for flooring and decoration.

Underfloor heating pipes cast into a fresh screed floor before tiling

Underfloor heating in the screed

Underfloor heating loops laid and cast into the screed. Once the floor was dry enough, the tiling could go over it.

Finished bathroom with walk-in shower, linear drain, wall hung toilet and beige tiling

Bathroom with walk-in shower delivered

Complete bathroom with a walk-in shower, linear drain, wall hung toilet with concealed cistern and a basin unit. Wall and floor tiles carried through for a calm result.

Got a project in mind?

Call or message us, or send your plans through with a few photographs. We normally respond within one working day and come over for a site visit at no cost.