Floor laying and tiling in Apeldoorn
A floor is the largest surface in the house. Crooked tiling or a bowed screed is something you see every day, so that is where we start.
Good tiling starts under the tile. We level the substrate, set the starting point so you never get a narrow strip on show, and keep the joints in line with the wall tiles.
The same holds for wood and laminate: flatness, the right underlay and enough expansion gap at the edges, particularly over underfloor heating.
What we do for you
- Pouring and levelling screeds
- Underfloor heating laid before the screed goes down
- Floor tiling in living rooms, kitchens, hallways and bathrooms
- Wall tiling, including niches and walk-in showers
- Laminate and wooden floors
- Skirting, threshold profiles and edge detailing
- Removing and disposing of old floors and tiles
- Levelling existing floors during a renovation


In short
- Duration
- 3 weeks to several months
- Budget from
- around 20,000 euro net labour cost
- Advance payment
- none
- Invoicing
- per worked week
How a project runs
Every project is different, but our sequence is fixed. That keeps the planning predictable and stops trades waiting on each other.
Introduction and site visit
We come over, walk the job and listen to what you have in mind. We also say honestly what we would advise against.
Plan and quote
You get a plan with the sequence of the work, a realistic duration and a price. No loose ends to argue about later.
Scheduling and purchasing
We reserve a team, buy the building materials through our partners, order the container and give you a list of stores for your own choices.
Frequently asked questions
Can tiles go over underfloor heating?
Yes, tiles are a good match for underfloor heating because they pass the heat on quickly. We do follow the commissioning cycle before we start tiling.
How long does a screed take to dry?
It depends on thickness and type. For a traditional sand cement screed, allow roughly a week per centimetre. We plan the work around it.
Do you lay laminate in an existing house?
Within a project we do it regularly, including levelling the subfloor and finishing with skirting.
Got a project in mind?
Call or message us, or send your plans through with a few photographs. We normally respond within one working day and come over for a site visit at no cost.