Home renovation in Apeldoorn and across the Netherlands

We strip it back, build it up and finish it off. One crew, one schedule, one point of contact.

Renovations rarely fail on craftsmanship. They fail on handovers between trades: the plasterer waiting for the electrician, the tiler who cannot start because the screed is still wet. We remove those handovers by doing the work ourselves. Our people are trained across several trades and have worked in the same crew for years, so they know what the next step needs.

We start with a site visit. You then get a plan with a sequence, a duration and a price. During the build we hold that sequence and check in weekly, so you never have to guess how far along we are.

What we do for you

  • Demolition and waste removal, container included
  • Stud walls, structural openings and layout changes
  • New electrics and plumbing, from consumer unit to waste pipe
  • Plastering, filling and wall finishes
  • Floors, laminate and tiling
  • Window frames, internal doors and bespoke carpentry
  • Painting inside and out
  • Builders' clean, so you get a house back rather than a building site
Renovation, work by TST-Bouw 1
Renovation, work by TST-Bouw 2

In short

Duration
3 weeks to several months
Budget from
around 20,000 euro net labour cost
Advance payment
none
Invoicing
per worked week

How a project runs

Every project is different, but our sequence is fixed. That keeps the planning predictable and stops trades waiting on each other.

  1. Introduction and site visit

    We come over, walk the job and listen to what you have in mind. We also say honestly what we would advise against.

  2. Plan and quote

    You get a plan with the sequence of the work, a realistic duration and a price. No loose ends to argue about later.

  3. Scheduling and purchasing

    We reserve a team, buy the building materials through our partners, order the container and give you a list of stores for your own choices.

Frequently asked questions

How long does a renovation take?

Most of our projects run from three weeks to several months. We give you a realistic duration at the site visit and we hold to it.

Can we stay in the house during the work?

Often yes, particularly when the work is limited to part of the house. During a full renovation it is usually uncomfortable. We tell you in advance which part is out of use and when.

Do you supply the materials?

We buy building materials through our established partners, which is usually sharper than buying them loose. For choices such as tiles, sanitary ware and flooring we give you a list of merchants and showrooms in your region.