Services have to be finished before the plasterer arrives. We do them ourselves, so that sequence never snarls up.

Most delay in a renovation happens around services. An extra socket that has to go in later means chasing into fresh plaster. So we put it on paper with you first: light points, switches, sockets, data, taps and waste.

And if a light point has to be added during the build, we do not make a fuss about it. Our rates deliberately leave room for changes of that size.

What we do for you

  • Renewing or extending a complete electrical installation
  • Replacing and extending the consumer unit
  • Light points, switches, sockets and data outlets
  • Outdoor lighting and garden connections
  • Installing and relocating water supply and waste
  • Connecting sanitary ware: toilet, shower, bath, basin
  • Kitchen connections for water, waste and power
  • Underfloor heating, laid and connected
Electrics and plumbing, work by TST-Bouw 1
Electrics and plumbing, work by TST-Bouw 2

In short

Duration
3 weeks to several months
Budget from
around 20,000 euro net labour cost
Advance payment
none
Invoicing
per worked week

How a project runs

Every project is different, but our sequence is fixed. That keeps the planning predictable and stops trades waiting on each other.

  1. Introduction and site visit

    We come over, walk the job and listen to what you have in mind. We also say honestly what we would advise against.

  2. Plan and quote

    You get a plan with the sequence of the work, a realistic duration and a price. No loose ends to argue about later.

  3. Scheduling and purchasing

    We reserve a team, buy the building materials through our partners, order the container and give you a list of stores for your own choices.

Frequently asked questions

Does an extra socket count as extra work?

Not straight away with us. Unlike many firms in the sector, our rates account for small changes like this during the build.

Do you replace consumer units?

Yes. On a larger renovation that is often sensible, certainly with an older installation that has too few circuits or no residual current devices.

Do you handle central heating and the boiler?

We take on pipework, radiators and underfloor heating. For fitting and commissioning the boiler itself we work with a certified installer.

Got a project in mind?

Call or message us, or send your plans through with a few photographs. We normally respond within one working day and come over for a site visit at no cost.